What an independent Primavera P6 schedule audit actually finds
An independent Primavera P6 schedule audit surfaces broken logic, false float and critical-path manipulation before they cost you at tribunal.
Read
Earned value only works when scope, schedule and cost sit on one baseline and progress is measured rather than estimated. We set up, run and test project controls for owners, lenders and contractors in India and the GCC, from the framework to the monthly forecast. The aim is a reported position that matches the site and the ledger.
Baseline. Evidence. Outturn.

Earned value only works when these are in place. Where they are not, we put them in place first.
A defined work breakdown structure, so every piece of work has one home and nothing is counted twice.
A logically linked Primavera P6 programme that passes basic quality checks and reflects how the work will actually be built.
Budgets assigned to control accounts and time-phased against the schedule, signed off before performance is measured.
Rules of credit and measured quantities agreed in advance, backed by contemporaneous site records.
Approved changes enter the baseline formally and traceably, so variances reflect performance rather than scope drift.
Central sector infrastructure projects of Rs 150 crore and above report physical and financial progress to MoSPI through the PAIMANA portal, so owner-side controls have to reconcile with what is reported upward. Public works pay running account bills against quantities recorded in the measurement book, usually to the relevant part of IS 1200, which gives earned value an objective base when the records are kept properly. Where a dispute goes to arbitration, the Arbitration and Conciliation Act, 1996 applies, and the measurement and progress record becomes the evidence.
Abu Dhabi government capital projects use the Abu Dhabi General Conditions Contract, which ADPIC updated in 2024 with mandatory Dispute Avoidance and Adjudication Boards, so current and agreed progress data matters during delivery, not only after it. On FIDIC-based contracts across the Emirates, the monthly progress report (Sub-Clause 4.21 in the 1999 edition, 4.20 in 2017) compares actual with planned progress and supports each interim payment application. Arbitration seated onshore is governed by Federal Law No. 6 of 2018, with DIAC in Dubai and arbitrateAD in Abu Dhabi the main local institutions.
The Expenditure Efficiency and Government Projects Authority (EXPRO), set up in 2021 and absorbing the former Mashroat programme, works with government entities on capital spending efficiency and project quality, so cost and progress reporting is read closely. The Civil Transactions Law, in force since 16 December 2023, now sets statutory rules for construction contracts (muqawala), including variations and price adjustment. Under Saudi Arabia's new Government Tenders and Procurement Law, every change order should be logged against the Article 67 limits, 10% for new items and 20% in total, or against the Article 69 cap of a 10% increase in contract value on contracts tendered under the 2019 law, so that budgets, baselines and estimates at completion show how much variation headroom remains. See what the new procurement law changes.
Public tendering falls under the Tender Law (Royal Decree 36/2008), and Royal Decree 57/2025 renamed the Secretariat General of the Tender Board as the Projects, Tenders and Local Content Authority. Government works commonly use either the Standard Documents for Building and Civil Engineering Works (4th edition, 1999) or the Standard Contract for Building and Civil Engineering Works (May 2019, Rev. 01). The 2019 Standard Contract is based on the FIDIC 1999 Red Book and requires a contract programme under Sub-Clause 8.3, 'Time Program', which gives an earned value baseline a contractual starting point. Where a contract provides for arbitration, the Oman Commercial Arbitration Centre, established by Royal Decree 26/2018, is the local institution.
We start with the foundations: a defined work breakdown structure, a linked programme, a signed-off budget, measured progress and disciplined change control. Where one is missing we fix it before reporting a single index, because earned value built on a weak baseline produces confident but wrong numbers. We then run the cycle with your team each month. For owners and funders, we report independently of the party whose performance is being measured.
Programme assurance where approvals sat on the critical path but were never modelled.
Independent design assurance on a high-specification villa fit-out programme.
EOT entitlement and forensic windows analysis on a major rail programme in dispute.
An independent Primavera P6 schedule audit surfaces broken logic, false float and critical-path manipulation before they cost you at tribunal.
ReadWhat the DCMA 14-point schedule assessment checks, why BEI and CPLI matter, and a worked Primavera P6 example of a failing programme.
ReadA single completion date is a fiction. How QSRA turns P50, P80 and P90 into decisions on the working programme, commitment and contingency.
Read
Send us your current baseline and latest monthly report. We will tell you plainly where the numbers hold, where they do not, and what it takes to fix them.