Experience on complex, contested programmes.
Selected engagements delivered by Project Assure across rail, flood infrastructure, energy, residential and manufacturing. Many mandates are confidential by agreement.
Hafeet Rail
EOT entitlement and forensic windows analysis on a major rail programme in dispute.
- Forensic windows analysis produced
- Design-change impacts separated from concurrent contractor causes
- EOT entitlement structured and substantiated
Etihad Rail Stage 2 & 3
Independent systems assurance across a complex multi-contract programme.
- Systems assurance framework established
- Design stage-gate assessment integrated
- Assurance deliverables through construction and commissioning
World Bank · Tawi River
Programme assurance where approvals sat on the critical path but were never modelled.
- Approval dependencies mapped
- Baseline revised to realistic timelines
- P50 and P80 scenarios for funder reporting
Barka waste-to-energy IPP
Bid assurance on a waste-to-energy bid whose tender commitments would bind for 25 years.
- Bid programme stress-tested against design and permit lead times
- Risk allocation reviewed against FIDIC Silver Book
- Commercially defensible position established
Palm Jebel Ali villa fit-outs
Independent design assurance on a high-specification villa fit-out programme.
- Independent design review across fit-out packages
- Coordination and buildability risks surfaced early
- Design assurance aligned to construction stage-gates
HYT Manufacturers
System assurance across design, integration and verification on a manufacturing programme.
- System assurance framework delivered
- Requirements-to-verification traceability established
- Integration and readiness risks assured to handover
Programmes our principals have worked on.
Before and outside Project Assure, our principals have delivered on programmes for these organisations. Listed for experience, not as Project Assure appointments.
- World Bank
- Asian Development Bank
- Abu Dhabi Airports
- ITC Limited
- ACC Limited
- IIT Madras
- VOC Port Trust

Facing something similar?
Tell us the project and the question. A principal replies within one working day.