Independent project assurance & forensic delay analysis in the UAE
We support owners, lenders and contractors across the UAE (Dubai, Abu Dhabi and the wider Emirates) with independent project controls, forensic delay analysis and EOT/quantum claims built to hold under FIDIC and in arbitration.
Why independent assurance matters in United Arab Emirates
The UAE runs some of the most contractually intensive programmes in the world: rail, aviation, waterfront and mixed-use megaprojects delivered largely under the FIDIC Red, Yellow and Silver Books, with disputes resolved through DIAC (which absorbed the former DIFC-LCIA centre in 2021), arbitrateAD in Abu Dhabi and the UAE courts. When a programme slips, entitlement turns on contemporaneous records, a defensible delay method and a clean baseline. Not on the strength of the argument.
That is where we work. We are appointed by one party, and we build our analysis to be tested by the other. We separate design-change and employer-caused delay from concurrent contractor causes, and structure EOT, prolongation and disruption positions that survive scrutiny. On Etihad Rail Stage 2 & 3 we provided independent systems assurance across construction and commissioning.
Focused pages: EOT claim consultant, UAE · Forensic delay analysis, UAE
- Forensic delay analysis: TIA, windows and as-planned vs as-built, to the SCL Protocol and AACE RP-29R-03
- EOT, prolongation and disruption claims under FIDIC, prepared, interrogated or defended
- Primavera P6 schedule assurance: DCMA 14-point and GAO 9-point, monthly, not only at claim time
- Quantitative risk (QSRA) and independent programme assurance for owners and lenders
- Bid and tender programme assurance before you sign a FIDIC EPC contract
Sectors: Rail & metro · Aviation · Waterfront & real estate · Energy & utilities · Giga-projects
Our services in United Arab Emirates
Project Planning
Tender, baseline, design, procurement and commissioning programmes built to be followed, reviewed and defended.
Learn moreProject Controls & EVM
Integrated schedule and cost control, objective progress measurement and earned value reporting that drives action.
Learn moreForensic Planning & Delay Analysis
Delay analysis, extension of time assessments and claims support grounded in the contemporaneous record.
Learn moreDispute Avoidance & Resolution Support
Early warning, claims and position papers, and evidence for DAAB, mediation and arbitration, alongside your counsel.
Learn moreRisk Management
Risk workshops, live registers and quantitative schedule and cost risk analysis (QSRA and QCRA).
Learn moreData Centre Consultancy
Integrated master programmes from design to IST and handover, plus market and siting intelligence.
Learn morePMO & Governance
PMO set-up, stage-gate assurance, independent design review and reporting that boards and funders can rely on.
Learn moreWorking with us in United Arab Emirates
Do you provide forensic delay analysis in the UAE?
Which contract forms do you work under in the UAE?
Can you support a live dispute in Dubai or Abu Dhabi?