Project Assure
Home / Tools / GenSched Intelligence
02 · Proprietary Tool

GenSched · Generative Scheduling Engine

Stop typing the schedule. Start generating it. GenSched reads BoQ, drawings and method statements and writes a fully-logicked, resource-loaded CPM, exportable to Primavera P6 and MS Project on day one.

automated schedule generationgenerate CPM from BoQAI scheduling toolPrimavera P6 automationresource loaded scheduleconstruction programme generator
Request a demonstrationLaunch the tool ↗

What it delivers

BoQ & drawings to CPM

Reads bills of quantities, drawings and method statements and generates a fully-logicked critical-path programme.

Resource-loaded output

Activities come resource-loaded and calendar-aware, ready for levelling and baseline.

P6 & MS Project export

Native export to Primavera P6 and Microsoft Project. No re-keying.

Assurance-ready by design

Schedules generated to survive a DCMA 14-point check from the outset.

Who it's for

Frequently asked questions

Can I generate a Primavera P6 schedule automatically?

Yes. GenSched reads your BoQ, drawings and method statements and generates a fully-logicked, resource-loaded CPM that exports directly to Primavera P6 and MS Project.

Will the generated schedule pass a DCMA check?

GenSched builds logic and structure designed to survive a DCMA 14-point assessment from the outset, which you can verify instantly with Schedule Intelligence.

Related

See GenSched Intelligence on your own project.

A principal responds within 24 hours. No delegation to analysts, no dilution across mandates.

Start the conversation